Rosemont Copper Reports
2008 Mineral Resource Update
Ambient Air Quality and Meteorological Data Through 1st Qtr 2009
Aquifer Protection Permit Application
- Rosemont Copper APP Application Vol 1 - February 2009
- Rosemont Copper APP Application Vol 2 - February 2009
- Rosemont Copper APP Application Vol 3 - February 2009
- Rosemont Copper APP Application Vol 4 - February 2009
- Rosemont Copper APP Application Vol 5 - February 2009
- Rosemont Copper APP Transmittal Letter - 27Feb2009
- Tetra Tech APP Transmittal Letter - 27Feb2009
Arizona Mined Land Reclamation Plan
- AZ Mined Land Reclamation Plan Part 1
- AZ Mined Land Reclamation Plan Part 2
- AZ Mined Land Reclamation Plan Part 3
- AZ Mined Land Reclamation Plan Approval
Background Ambient Noise Study
Biological Reports
- Agave Survey Technical Memorandum
- Bat Survey Technical Memorandum
- Rosemont Waterline PPC Survey
- Rosemont 2008 Ranid Survey 04/24/09 with Updated Figure 2
- Bat Roost Survey 2009
- Pima Pineapple Cactus Survey 2009
- Rosemont 2009 Ranid Survey
- Talus Snail Report 4/15/10
Dry Stack Tailings
- Rosemont Dry Stack TSF design Report (4.15.09)
- AMEC SWMP Preliminary Design Report App A 4/2/10
- Dry Stack Stability Analysis 12/15/09
- Dry Stack Tailings SW Management 4/5/10
- Tailings Drainage Bench Analysis 12/8/10
- Tailings Geochemistry 3/24/09
- Tailings Geochemistry 10/10/08
Filtered Tailings Dry Stacks - Current State of Practice
Geochemistry Reports
- Baseline Geochemical Characterization
- Geochem Charaterization Addendum 1
- Evaluation of Rosemont Geochemical Testing Results and Local Water Quality
- Technical Memorandum - Geochemistry Sample Update November 2008
- Technical Memorandum - Tailings Geochemistry March 2009
- Geochemical Pit Lake Predictive Model February 2010
- Infiltration, Seepage, Fate and Transport Modeling Report February 2010
- Bolsa ABA & HC Testing 10/7/09
- Geochem Results & WQ 5/5/09
- Geochem Sample Method 11/2/09
- Geochem Update 11/10/08
- Site Surface Soils Geochem 1/26/10
- WR Material Characterization 1/8/10
- Geotechnical Addendum Volume 1
- Geotechnical Addendum Volume 2
- Geotechnical Addendum Volume 3
- Plant Site Geotechnical Report August 2009
Groundwater Flow Modeling
Heap Leach Facility
- HFL SW Management Analysis 4/6/10
- Minimum WR Thickness Analysis - Rev 2 1/14/10
- Prescriptive BADCT for LF Ponds 1/14/10
- Rainfall Run-off Volumes HLF 4/29/10
Hydrogeology Report
- M&A Hydrogeologic Investigation & Monitoring Program Vol 1
- M&A Hydrogeologic Investigation & Monitoring Program Vol 2
- Comparison of Natural Fluctuation in Grounwater Level to Provisional Drawdown Projections March 1, 2010
- Davidson Canyon Report April 2010
Lighting
Long Term Pump Test
- Rosemont Multi Well Test Volume 1 - May 2009
- Rosemont Multi Well Test Volume 2 - May 2009
- Rosemont Multi Well Test Volume 3a - May 2009
- Rosemont Multi Well Test Volume 3b - May 2009
- Rosemont Multi Well Test Volume 3c - May 2009
- Rosemont Multi Well Test Volume 3d - May 2009
- Rosemont Multi Well Test Volume 3e - May 2009
- Rosemont Multi Well Test Volume 3f - May 2009
- Rosemont Multi Well Test Volume 3g - May 2009
- Rosemont Multi Well Test Volume 3h - May 2009
- Rosemont Multi Well Test Volume 3i - May 2009
- Rosemont Multi Well Test Volume 4 - May 2009
Miscellaneous
- Design Storm and Precipitation
- Rosemont Tailings Geochmistry Technical Memorandum
- Process Water Pond, Temorary Storage Pond, and Settling Basin Design Report
- BADCT Closure for Lined Facilities 3/15/10
- Waste Rock Stability Analysis 3/12/10
- Well Inventory Update 1/28/10
Noise Report
- Rosemont Supplemental Noise Study Report April 2009
- Background Ambient Noise Study Rosemont Copper October 2008
Reclamation
- Phase 1 Final Report
- Phase II Preliminary Report
- Phase II Final Report
- Reclamation and Closure Plan July 2007
- Reclamation Concept Update March 2010
- Reclamation Concept Update March 2010 Appendices
- Reclamation Concept Update March 2010 Figure Set 1
- Reclamation Concept Update March 2010 Figure Set 2
- Reclamation Concept Update March 2010 Figure Set 3
- Reclamation Concept Update March 2010 Text
- Open Pit Wall Coloration 1/8/10
- Soil Erosion Estimates 3/11/10
Riparian
Site Water Management
- Baseline Hydrology & ARR Memo 3/4/10
- Flow Through Drain Sizing 4/5/10
- Flow Through Drain Design 4/5/10
- Hydro Method Just 1/27/10
- Infiltration Analysis 4/5/10
- Modified Infiltration Rate 5/28/09
- Pit Diversion Channel Design 4/10/10
- Post-Mining Hydrology & ARR Memo 3/5/10
- Sediment Delivery 4/9/10
- Site Water Volume 1
- Site Water Volume 2
- Site Water Volume 3
- Site Water Volume 4
- Site Water Volume 5
- Surface Water Quality Baseline Analysis 4/13/10
- Waste Rock SW Management 4/2/10
Traffic Report
- AZ-83 Roadway Assessment Report July 2009
- Rosemont Traffic Analysis Report April 2009
- Technical Memorandum - State Route 83 Scenic Road Evaluation for Rosemont May 2009
- Rosemont Traffic Study - Additional Scenarios February 23, 2010
- Acceleration Lane Alt 6/4/09
- Bypass Lane Alt 6/4/09
- School Bus Stop Improvememts 6/25/09
- SR 83 Evaluation 5/11/09
- Stop Sign Speed Reduction 6/4/09
- Wide Load Truck Turnout 6/15/09
Water Supply Design Concept Report
Water Supply Hydrology
- Technical Memorandum - Second Update to ADWR Model in Sahaurita/Green Valley Area April 2009
- Technical Memorandum - Update to ADWR Model in Sahuarita/Green Valley Area December 2008
- Draft Report - Results of Construction, Development and Testing for Production Water Well Pima County AZ January 2008
- Report - Results of Construction, Development and Testing for Exploration Water Well Pima County AZ April 2007